{"id":5495,"date":"2024-05-29T10:49:52","date_gmt":"2024-05-29T08:49:52","guid":{"rendered":"https:\/\/gfwa.com.au\/?post_type=avada_portfolio&p=5495"},"modified":"2024-06-25T16:45:00","modified_gmt":"2024-06-25T14:45:00","slug":"boddington-slurry-wall","status":"publish","type":"avada_portfolio","link":"https:\/\/gfwa.com.au\/offer-portfolio\/boddington-slurry-wall\/","title":{"rendered":"Boddington Slurry Wall"},"content":{"rendered":"
The Boddington Slurry Wall is a significant environmental engineering project located at the Boddington Gold Mine in Western Australia. The slurry wall is designed to contain and manage tailings, which are the by-products of the mining and ore processing operations.<\/p>\n<\/div>
Our scope included supply and installation of 608 Lm of Slurry wall, 600m thick and 7m deep. Equating to 5228 m2 of excavation.<\/p>\n<\/div><\/div><\/div>
Owner:<\/span> <\/p>\n<\/div> Client:
\nNewmont<\/span><\/b><\/p>\n
\nErtech<\/span><\/b><\/p>\n